Dimensioning concrete superstructure
Abridged report - Dimensioning

Stress and construction of concrete pavement boundaries
Abridged report - Pavement boundaries

Dimensioning of reinforced concrete pavement
Abridged report - Dimensioning

Evaluation of research - Systematics of road maintenance
Abstract - Systematics of road maintenance

Criteria for consideration of additional lanes during maintenance
Abstract - Consideration of additional lanes

Zeitreihenanalyse visueller Zustandsaufnahmen und -bewertungen von Stra▀en
Abstract - Time series analysis

References *

Researches

Probabilistic Procedure for Design of traffic areas
Part- Concrete Construction
Client Period Fe-Nr.
Federal Highway Research Institute(BASt) 2008–2010 04.218/2008/ARB
Basic collection of loads for Analytic Design of Roads
Part- Concrete Roads
Client Period Fe-Nr.
Federal Highway Research Institute(BASt) 2008–2009 04.197/2004/ARB
Functional Requirements for Earth-works and drainage in functional Contracts
Client Period Fe-Nr.
Federal Highway Research Institute(BASt) 2005–2007 05.142/2005/ARB
Further Development of Thickness Design Methods for Concrete Pavements
Client Period Fe-Nr.
Federal Highway Research Institute(BASt) 2005–2007 04.194/2004/AGB
Basis-developing to create a technical Test Procedure for Ascertainment and Appraisal of Road Surface Attributes
Client Period Fe-Nr.
IWS Messtechnik / Federal Highway Research Institute(BASt) 2004–2007 04.201/2004/ARB
Creation and Delivery of a Pictured Exemplary Documentation about the Most Common and Typical Visible Damages of Road Surfaces.
Client Period Fe-Nr.
Federal Highway Research Institute(BASt) 2005 05/1024/S1 001
Material Depending Parameters for Dimensioning of Concrete Pavements - Part: Thickness Design of Contineously Reinforced Concrete Pavements(CRCP).
Client Period Fe-Nr. PDF-Download
Federal Highway Research Institute(BASt) / Dr. Pfeifer 2002–2005 04.189./2002/AGB
Stress and Construction of Concrete Pavement Boundaries
Client Period Fe-Nr. PDF-Download
Federal Highway Research Institute(BASt) / Dr. Pfeifer 2004 89.136/2004
Techniques of Dimensioning Concrete Superstructures
Client Period Fe-Nr. PDF-Download
Federal Highway Research Institute(BASt) 2000–2002 08.160/2000/CRB
Criteria for Consideration of Additional Lanes during Maintenance Measures on Multiple-Lane Divided Highways
Client Period Fe-Nr. PDF-Download
Federal Highway Research Institute(BASt) 1998–2000 09.111/1998/MGB
Evaluation of Research Papers about the Systematics of Road Maintenance
Client Period Fe-Nr. PDF-Download
Federal Highway Research Institute(BASt) 1996–1998 09.109/1996/MRB
Time Series Analysis of Visual Recordings and Assessments of Road Conditions
Client Period Fe-Nr. PDF-Download
Federal Highway Research Institute(BASt) 1997–1999 09.106/1997/MGB

*Original titles to be fund on German site

Public-Private-Partnership

Consulting in alternative Planning, Dimensioning and Maintenance during Offer Phase
Client Period Section
Consortium 2005/2006 A8, 52 km length
Consulting in alternative Planning, Dimensioning and Maintenance during Offer Phase
Client Period Section
Consortium 2006/2007 A4, 31,5 km length
Consulting in alternative Planning, Dimensioning and Maintenance during Offer Phase
Client Period Section
Consortium 2007 A1, 72,8 km length
Consulting in alternative Planning, Dimensioning and Maintenance during Offer Phase
Client Period Section
Consortium 2007 A5, 86,8 km length

Expertises - Selection*

  • Dimensioning of superstructures on gravel subbase for an "Autobahn" section - especially for times of changed traffic routing
  • Dimensioning of an concrete motorway using the theoretical basis of mathematical and statistically analysis of split tensile strength
  • Alkali-silica-reaction damaged heavy loaded pavement of an autobahn service area with petrol station - calculation of remaining load bearing capacity and corrective maintenance
  • Equality analysis for different drainage designs on airport runways
  • A railway siding area of cargo transport centre - damages of heavy loaded concrete pavements close to railtracks
  • For realization of methodical replenishing of urban concrete pavements after local earth-works
  • Damage expertise and corrective maintenance concept of an industrial hallfloor

*Titles have been made anonymous